Before firing, which is usually done electrically, the engineers calculate the exact diameter of the crater to be formed, and the previous night the infantry or engineers will have completed a trench forward from the front-line or "jumping-off" trench, to an intersection with the rim of the proposed crater.
— from Fighting the Boche Underground by H. D. (Harry Davis) Trounce
|